Baltic Sea Bridge reaches first milestone

20.08.2020

Since the end of March, Mukran Port Terminals has been operating, in cooperation with DBO Bahnoperator, a fixed sea link, flagged Baltic Sea Bridge, as part of the New Silk Road between Asia and Europe.

With the Mukran port and industrial zone and the handling of short sea container loads the Baltic Sea Bridge serves as an interface for the United Transport and Logistics Company — Eurasian Rail Alliance (UTLC ERA) to western Europe.

After increasing the frequency and deploying a larger vessel, the still young corridor is preparing for its next milestone. The MS «Milady» is currently conveying its 5,000th container unit (teu) towards Baltijsk in the Kaliningrad area in Russia.

«The Mukran — Baltijsk connection has done well over the last six months. We are eager to see how fast we can reach the 10,000 teu mark,» says Arne Ehlers, managing director of the BREB shipping company that manages the charter process for Baltic Sea Bridge.

Analytics on topic
Article
01.01.2020
Can the New Silk Road Compete with the Maritime Silk Road?
What are the pros and cons of the rail routes compared to the sea?
Report
01.05.2020
Report
01.05.2020
Defining the future of freight transport
The aim of the LEVITATE project is to develop a new impact assessment framework to enable policymakers to manage the introduction of connected and automated transport systems, maximise the benefits and utilise the technologies to achieve long-term visions and goals. An essential part of this work seeks to forecast societal level impacts of connected and automated transport systems (CATS). These include impacts on safety, environment, economy and society.